What is the minimum order quantity and do you accept small batches?
Answer
A: An MOQ is a hard floor on the quantity a supplier will accept. A lot charge is a floor on the amount billed for one production run, so the supplier does accept a smaller quantity but the fixed cost is recovered in the price. Both are calculated from the same fixed cost per lot. Q: Does Balford have a minimum order quantity?
Sources
- How Are MOQ And Lot Charges Calculated In Metal Stamping?A: An MOQ is a hard floor on the quantity a supplier will accept. A lot charge is a floor on the amount billed for one production run, so the supplier does accept a smaller quantity but the fixed cost is recovered in the price. Both are calculated from the same fixed cost per lot. Q: Does Balford ha...
- How Are MOQ And Lot Charges Calculated In Metal Stamping?What is the difference between an MOQ and a lot charge? An MOQ is a hard floor on the quantity a supplier will accept. A lot charge is a floor on the amount billed for one production run, so the supplier does accept a smaller quantity but the fixed cost is recovered in the price. Both are calculated...
- Custom Metal Stamping Services | Tooling & Quotation | BalfordTool build and tryout - on Balford production presses, so the sample comes off the process you will be supplied from. First article inspection - dimensional results against the confirmed drawing. PPAP-aligned documentation - at the level your quality department specifies. Series production - with lo...
- Lead Time and MOQ | Deep Drawn PartsThere is no fixed MOQ. The practical minimum follows from the process: a single-operation die makes a small first batch economic, a progressive tool only pays back at volume, and an externally applied finish can carry its own batch minimum. Send the target quantity with the drawing and the review wi...
- Custom Metal Stamping Services | Tooling & Quotation | BalfordQuestion What we tell you Which tool type? Single-hit, progressive or transfer - recommended from the annual volume and the number of operations, including the volume at which the cheaper route would have been right What does the tool cost? Quoted per project, split into design, build and tryout, wi...
- Lead Time and MOQ | Deep Drawn PartsHome › Buyer guides › Lead Time and Order Quantity For buyers · Schedule Lead Time and Order Quantity Sample lead times by process, tooling build time, expedite options and the MOQ position How long does it take, and is there a minimum order? Sample lead times are published by proce...
What an engineer still needs from you
- material and material condition (grade, temper)
- material thickness, plus the key diameter, height and wall thickness
- tolerances, burr direction and the visual acceptance standard
- annual volume - it decides whether tooling is single-hit, progressive or transfer
- surface finish, and any secondary machining, annealing or plating
Need a DFM feasibility assessment for your project?
Send the engineering drawing (STEP or PDF) with the material grade, thickness and annual volume. Balford engineers then check it against the process window - draw ratio, wall thickness, tolerances, blank and tooling route - and come back with what is feasible and what is not. An answer on this page cannot replace that review.
Upload a drawing for DFM reviewHow the DFM review worksRelated questions
- What drives the cost of a stamped or deep drawn part?
- At what volume does a progressive die pay back?
- What is the production lead time after tooling is approved?
- How do I evaluate a metal stamping supplier in China?
- How are stamped parts packed and shipped from China?
- How are drawings protected and can you sign an NDA?
This page is an engineering answer, not a quotation and not a dimensional acceptance. It is generated from Balford's published material and held to the verified company fact sheet.