본문으로 건너뛰기
딥 드로잉 · 금속 스탬핑 · CNC 가공 · 솔레노이드 밸브 하우징 · 로봇 및 UAV 금속 부품 · PPAP 준비 완료

Engineering & Procurement Resources

Metal Stamping RFQ, IMDS and Supplier Audit Checklists

Updated September 3, 2026 · Balford Technical Team

Direct answer: A complete RFQ does not need a long email. It needs the drawing, material grade, quantity, finish, critical tolerances, required documentation and any customer-specific requirement revision. The checklists below help you send the right information the first time and reduce quotation loops.

1. Drawing and RFQ checklist

2. IMDS / material compliance checklist

Use the full 15-step IMDS compliance checklist before submission. The highest-risk points for stamped and deep-drawn metal parts are missing plating layers, wrong component/material structure, incorrect weight, and using an outdated customer requirement revision.

3. Supplier audit checklist

For the supplier-selection logic behind this list, see how to evaluate a metal stamping supplier in China. For Balford's specific quality and compliance posture, see quality and certifications.

Download / use

These checklists are intended to be copied into your RFQ or supplier questionnaire. If you prefer a project-specific review, send your drawing and requirements through contact.

RFQ Review

Send a drawing and receive a manufacturing review.

Include the checklist information for a faster response and a tighter quotation.

Request A Quote →