What inspection equipment do you use?

Answer

Being precise about the boundary is more useful to a buyer than a longer equipment list: No coordinate measuring machine (CMM). For complex free-form geometry we use the 3D scanner, and for parts that need a formal CMM report we arrange measurement with a partner laboratory and say so before quoting. No in-house metallurgical laboratory. full material certification comes from the mill, and heat treatment is carried out by qualified partner plants.

Sources

  1. Inspection Lab | First Article Inspection & PPAP
    Being precise about the boundary is more useful to a buyer than a longer equipment list: No coordinate measuring machine (CMM). For complex free-form geometry we use the 3D scanner, and for parts that need a formal CMM report we arrange measurement with a partner laboratory and say so before quoting...
  2. Choosing a Metal Stamping Manufacturer or Supplier in China
    Prepare a short list of questions about quality staffing ratios (QC headcount vs. total headcount), inspection equipment, and calibration records. On the floor: what to observe Housekeeping and flow. Is material storage organized? Are coils and blanks clearly labeled with material grade? Disorder co...
  3. Custom Sheet Metal Bending Services | Balford
    Inspection uses digital height gauges, micrometers, radius gauges and vision measurement, alongside the optical measuring projector and hardness and salt-spray equipment used for qualification work. PPAP Level 3 documentation is available for new programmes. Sheet metal bending FAQ What sheet metal ...
  4. Balford Quality | ISO 9001 and IATF-Aligned Controls
    Element What Balford states Quality management system ISO 9001:2015 Automotive quality Process controls aligned to IATF 16949 requirements - not an IATF 16949 certificate New part release First article inspection (FAI) against the confirmed drawing Production part approval PPAP-aligned documentation...
  5. PPAP-Ready Stamping & Deep Drawing Supplier | Balford
    Package and PSW: the complete submission is reviewed internally, then issued with the signed Part Submission Warrant. Controls that continue after approval First article inspection (FAI) at every new tool, transfer or major process change In-process checks at defined frequencies with calibrated plug...
  6. Verified company facts and boundaries
    outsourced_processes: ["bulk heat treatment (die + production parts)","slow-wire EDM","passivation","electropolishing","plating","phosphating","liquid painting","electrophoretic coating / e-coating (电泳)","hot forging 红冲 (machining pre-forms)","cold extrusion 冷挤压 (machining pre-forms)","cold heading ...

What an engineer still needs from you

  • material and material condition (grade, temper)
  • material thickness, plus the key diameter, height and wall thickness
  • tolerances, burr direction and the visual acceptance standard
  • annual volume - it decides whether tooling is single-hit, progressive or transfer
  • surface finish, and any secondary machining, annealing or plating
Next step. Send the drawing for a manufacturability review, or send the part data for a process and cost route.
Submit a drawing / RFQDFM review

Related questions

This page is an engineering answer, not a quotation and not a dimensional acceptance. It is generated from Balford's published material and held to the verified company fact sheet.