Lewati ke konten

Contact Balford — Get a DFM Review & Quote

Send your part drawing to Balford, a China metal stamping and deep drawing manufacturer in Zhuji, Zhejiang (ISO 9001:2015, 12,000 m² factory, 500+ machines). The fastest route is the Balford RFQ platform: upload your drawing, and our engineers review material, tolerances and forming route before quoting.

Send Your Drawing for a DFM Review → Email shawn@balford.net

Fastest — RFQ Platform

Start an RFQ on rfq.balford.net

Upload drawings on the managed RFQ platform. Balford RFQ administrators review each request and route it to approved suppliers; buyers keep full visibility of review status.

Open rfq.balford.net →
Direct Email

Email the team

Inquiry and sales: shawn@balford.net. Send drawings, PDF, DXF, STEP or IGES plus annual volume, material and target finish for the fastest quote.

Email shawn@balford.net →
Phone / WhatsApp

Call or message

Manager: +86 135 8846 2222 (China Standard Time, UTC+8). English, Chinese and German speaking team; message us for a call-back window that suits you.

Call +86 135 8846 2222 →

What to send for a faster, more accurate quote

Not sure what Balford can make? Browse metal stamping services, deep drawingreal production case studies first.

Response commitment

Quote responseWithin 24 hours after drawings and requirements are received (China Standard Time, UTC+8, workdays).
Office hoursMonday to Friday, 07:30–17:00 China Standard Time (UTC+8). Closed at weekends and on Chinese public holidays.
DFM feedbackWithin 48 hours — forming risks, material and tolerance feedback before tooling.
SamplesTypically 7–30 days depending on process and tooling requirements.

Factory location

Zhejiang Balford Mechatronics Co., Ltd. (Balford)
2#, Guangfa Road, Yaojiang, Zhuji, Shaoxing, Zhejiang Province, 311800, China.
12,000 m² manufacturing plant; presses from 25 t to 350 t; CNC, EDM and tube forming lines. See factory profile and equipmentfrequently asked questions.

Questions buyers ask before sending a drawing

How do I send a drawing to Balford for a quote?

The fastest way is the Balford RFQ platform at rfq.balford.net — register, post your RFQ and upload drawings. You can also email shawn@balford.net with PDF, DXF, STEP or IGES files plus quantity, material and finish requirements.

How fast is Balford's RFQ and DFM response?

We typically respond to all inquiries within 24 hours (China Standard Time, UTC+8). A complete quote follows once drawings and requirements are received, and DFM feedback is provided within 48 hours, flagging forming or tolerance risks before tooling.

What file formats does Balford accept?

PDF drawings, DXF, STEP and IGES 3D models. Including material grade, annual volume, critical tolerances and surface treatment makes the quote faster and more accurate.

Where is Balford's factory located?

Balford operates a 12,000 m² plant at 2#, Guangfa Road, Yaojiang, Zhuji, Shaoxing, Zhejiang, China (311800) — close to the Ningbo and Shanghai ports for export shipping.

Does Balford sign NDAs for drawings?

Yes. Customer drawings and technical information are treated as confidential; we sign confidentiality agreements and strictly control the use and storage of submitted files.

Get a DFM Review & Production Quote

Send your drawing and requirements — Balford usually responds within 24 hours with feasibility feedback and a production quote.

Send Your Drawing for a DFM Review →