Prototyping & validation
Before you commit to a hard tool, we can quote a prototype or soft-tool route: wire-cut or laser-cut blanks, a temporary or partially hardened die, and small-batch forming, so geometry, material behaviour and fit are proven on a real part. The same tool room that builds the production die builds the prototype — which is why the knowledge transfers instead of being lost.
Send the drawing and the model with the material specification, the annual volume and the dimensions that actually matter. We review the draw ratio or strip layout, the number of forming operations, the material's behaviour in that geometry, and where the forming risk sits. The output is a specific route with a stage sequence, a tooling concept and a tonnage estimate — not a generic statement that the part is feasible.
The most expensive moment in a tooling programme is discovering a geometry problem during tryout. Review is designed to move that discovery earlier, where it is cheap.
Depending on what has to be proven, the prototype can take one of three forms:
Which route makes sense is a technical decision, not a commercial upsell: a machined prototype proves fit but says nothing about formability, and a soft tool costs more but answers the question that actually matters at this stage.
The first parts off the tool are measured against the drawing in full: every dimension reported, with the drawing ballooned so the report can be read alongside it. Material certificates come back from the mill or supplier, hardness is verified on the Rockwell tester after heat treatment, and where the control plan marks significant characteristics, a capability study is run rather than a single measurement.
Gauging is in-house, so the same instruments that produce the FAI report also run incoming inspection on outsourced heat treatment and plating — the full list is on the equipment list.
Prototype acceptance is not the end of the process. The transition to serial production is a controlled one: tryout results and open items are closed out, the process is documented with a process flow, PFMEA and control plan, measurement systems are verified, and the PPAP submission is assembled at the level the customer requires. Where the part is automotive or enters an automotive assembly, IMDS material data is submitted through the Balford IMDS process.
See PPAP capability for the documentation set we support.
It depends on the route. A machined or blank-form prototype can be produced quickly because it does not require a complete die; a soft tool follows the normal tooling sequence, which typically takes 15–30 natural days including tryout.
Sometimes. Where material and geometry allow, a soft or partially hardened tool can be brought up to production condition instead of being scrapped. That decision is reviewed on the prototype results rather than assumed at the start.
The engineering review that establishes feasibility, forming route and risk is part of the quotation process. We prefer finding a problem in review to finding it in tryout.
Tell us what has to be proven — formability, fit, material behaviour or appearance — and we will tell you which prototype route answers that question at the lowest cost.