Why a complete RFQ matters

A complete RFQ does not need a long email. It needs seven things: the drawing, the material grade, the quantity, the finish, the critical tolerances, the required documentation, and the correct revision of any customer-specific requirement.

Every missing line costs a round trip. Three round trips typically cost a week or more, before the supplier has started on the tooling.

The items buyers most often leave out: the measurement position for wall thickness, whether the OD or the ID is the functional diameter, the packaging specification, the volume ramp, and the revision of the customer requirement.

This is the checklist we would send you. Copy it into your own RFQ.

Sources: balford.net/resources/checklists/ and balford.net/contact/.

1. Drawing and model

An RFQ with these eight lines is complete enough to quote without a clarification loop.

2. The five questions to ask about every quotation

  1. What draw ratio, blank size and press tonnage did you calculate?
  2. What is the forming route, and how many operations does it take?
  3. Which dimensions are set by the tooling, and which drift with material lot and springback?
  4. If the first article is out of tolerance, what is the remedy, and who pays for the die change?
  5. What is the lead time split between building the tool and producing saleable samples?

Those three numbers - draw ratio, blank size, tonnage - explain most of the difference between two very different quotations for what looks like the same part.

3. Wall thickness: the most common first-article dispute

Drawing thins the wall where it passes over the die radius. A drawn part is close to nominal at the bottom centre, thinnest in the lower wall, and slightly thick again at the top edge because the flange compressed as its circumference shrank.

That gradient is the physics of the process, not a defect.

A wall thickness callout without a measurement position cannot be held by anybody: the supplier and the customer measure at different heights and both are correct.

Fix it on the drawing. State the height, for example: 0.5 mm +/-0.05 measured 10 mm from the base.

One line on the drawing removes the most common sampling argument in deep drawing.

4. Material and process detail that changes the price

Material is usually the largest single line in a stamped or drawn quotation.

5. Documentation and compliance

The customer requirement revision is a common cause of a rejected IMDS submission, because it is often already out of date when it is sent.

6. IMDS: the four high-risk points on stamped parts

  1. Missing plating layers in the material structure
  2. Wrong component / material structure
  3. Incorrect weight
  4. An outdated customer requirement revision

Stamped and deep drawn parts fail IMDS on structure and weight far more often than on chemistry. Four points cause almost all of the rework:

Our 15-step IMDS compliance checklist is published at balford.net/imds-compliance-checklist/.

7. Supplier audit checklist

Ask which operations the supplier performs in house and which are subcontracted. An honest answer here predicts how the rest of the project will go.

Related pages

Printable version

This document is also available as a PDF: RFQ Checklist for Stamped and Deep Drawn Parts (PDF).

RFQ review

Send a drawing and receive a manufacturing review.

Share the drawing, material and volume and Balford will come back with a forming route, tooling position and a quotation.

Request A Quote →