Skip to content
Deep Drawing · Metal Stamping · CNC Machining · Solenoid Valve Housings · Robotics & UAV Metal Parts · PPAP-Ready

For buyers

Buyer Guides for Deep Drawn and Stamped Parts

What to send, what a drawing must state, what documents come back, and what drives lead time

What these guides cover

Five questions decide how quickly a deep drawn or stamped part can be quoted, tooled and released: what you send with the enquiry, what the drawing states, which documents your quality department needs, what material-compliance data is filed, and what drives lead time and order quantity. Each guide below answers one of them.

GuideThe question it answers
RFQ guideWhat information does a manufacturer need to quote a housing?
Drawing requirementsWhat has to be on the drawing for the part to be made right the first time?
PPAP and FAIWhat documentation comes back, and at which level?
IMDS dataHow is material compliance data filed for a drawn part?
Lead time and MOQHow long does tooling and sampling take, and is there a minimum order quantity?
Export and payment informationWho manufactures the parts, which company receives the payment, and the bank details, trade terms, tooling ownership and shipping documents?
Quotation response is typically within 24 hours after complete drawings and requirements arrive. The full commercial terms are in the quotation; what is published on lead time and quantity is on the lead time and MOQ page.

Written by the Balford engineering team, Zhuji, Zhejiang, China. Last updated 21 September 2026.

Balford catalogue and data downloads — sensor housing catalogues, configuration tables and checklists in PDF and CSV.